{"id":75104,"date":"2026-11-18T11:00:14","date_gmt":"2026-11-18T18:00:14","guid":{"rendered":"https:\/\/penderfund.com\/?p=75104"},"modified":"2026-11-18T11:37:49","modified_gmt":"2026-11-18T18:37:49","slug":"the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy","status":"publish","type":"post","link":"https:\/\/penderfund.com\/fr\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/","title":{"rendered":"The Great Infrastructure Build-Out: Investing in the Return of the Physical Economy"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-75135 aligncenter\" src=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-105530-1024x138.png\" alt=\"\" width=\"1024\" height=\"138\" srcset=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-105530-1024x138.png 1024w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-105530-300x41.png 300w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-105530-150x20.png 150w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-105530-768x104.png 768w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-105530-1536x208.png 1536w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-105530-18x2.png 18w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-105530.png 1590w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 14pt; color: #ab2258;\"><strong>01 - INTRODUCTION<\/strong><\/span><\/p>\n<p><strong>The End of Capital-Light<\/strong><\/p>\n<p><span data-contrast=\"auto\">For fifteen years, investors paid a premium for capital-light business models, businesses that scaled on code and near-zero marginal cost. Anyone who poured concrete, strung wire or pulled resources out of the ground got a very different message: cut capex and hand the cash back to shareholders.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">In our view, <\/span><span data-contrast=\"auto\">that era is ending. AI, electrification, reshoring, defence, energy security and a decade and a half of deferred spending are all pushing capital back into the physical economy at once and, importantly, into a syste<\/span><span data-contrast=\"auto\">m with very little spare capacity. We believe the result is a multi-year build-out the market may still be underestimating.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">But big spending isn't the same as good returns. A build this size creates backlogs and pricing power. It also inflates costs and, historically, leaves many investors holding assets that never earned their cost of capital. The question today is who will capture the economics of this capital supercycle and what will separate the winne<\/span><span data-contrast=\"auto\">rs and losers.\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p><span style=\"font-size: 14pt; color: #ab2258;\"><strong>02 -<\/strong> <strong>HOW WE GOT HERE<\/strong><\/span><\/p>\n<p><strong>The Cost of Underinvestment<\/strong><\/p>\n<p><span data-contrast=\"auto\">North America has spent roughly the last 15 years underinvesting in physical capacity. For most of that time, investors had it easy. Globalization kept costs low, central banks suppressed interest rates and capital flowed freely across borders. The biggest winners were asset-light businesses that could grow enormously without consuming much labour, energy, commodities or infrastructure.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">In hindsight this sounds reckless, but at the time it was a rational response to flat demand, cheap money and markets that rewarded capital lightness. But the bill has come due, all at once, to an industrial base sized for a world that no longer exists.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Where the Gaps Are<\/span><\/b><\/p>\n<p><span data-contrast=\"auto\">The underinvestment wasn't evenly spread. It has become clearly apparently in the same four areas now at the centre of the build:<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;multilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><b><span data-contrast=\"auto\">The power grid.<\/span><\/b><span data-contrast=\"auto\"> Transmission and distribution were maintained, not expanded.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;multilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"1\"><b><span data-contrast=\"auto\">Generation.<\/span><\/b><span data-contrast=\"auto\"> Little new firm capacity was added while demand flatlined, leaving less margin for error once load returned.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;multilevel&quot;}\" data-aria-posinset=\"3\" data-aria-level=\"1\"><b><span data-contrast=\"auto\">Energy production and pipelines.<\/span><\/b><span data-contrast=\"auto\"> After the 2014 oil crash, producers traded growth for shareholder returns, and major pipeline projects stalled or were cancelled.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;multilevel&quot;}\" data-aria-posinset=\"4\" data-aria-level=\"1\"><b><span data-contrast=\"auto\">The industrial base.<\/span><\/b><span data-contrast=\"auto\"> Offshoring left North America short of domestic capacity in everything from transformers to semiconductors.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">Taking the grid as an example, for<\/span><span data-contrast=\"auto\"> years electricity demand barely grew, so utilities had little reason to add capacity. They focused on maintenance rather than expansion. The same pattern played out across the other gaps. Energy producers returned cash instead of building, pipelines stalled, and manufacturers expanded overseas rather than at home. Each decision made sense on its own. Together, they left the system with almost no slack, which raises the question as to why an entire economy chose to stand still.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Part of the answer lies in the capital markets. In a zero-rate world, the highest multiples went to businesses with high ROIC, minimal reinvestment and recurring revenue. Heavy industry and energy were pushed toward returning capital through buybacks and dividends instead of building new capacity. Across markets, the cost of capital for long-lived physical assets rose in relative terms, even as absolute rates fell.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><strong>A Hollowed-Out Supply Chain<\/strong><\/p>\n<p><span data-contrast=\"auto\">Layer flat demand and capital discipline on top of decades of offshoring, and the industrial supply chain hollowed out. Fewer manufacturers of transformers and other heavy electrical equipment remained, and those that did had no reason to expand. Then demand turned, and there was no spare capacity to absorb it. Today, large gas turbines are now largely sold out through 2030.<sup>1<\/sup><\/span>\u00a0<span data-contrast=\"auto\">We believe, s<\/span><span data-contrast=\"auto\">upplier scarcity today has become a direct product of supplier rationalization in the past.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">To make things worse, North America's regulatory backdrop added friction. Transmission, pipelines and large generation projects have faced long, uncertain approval processes. Where projects could avoid multi-jurisdictional approvals, they got built. Elsewhere, they mostly didn't. In Canada, the problem was even more pronounced. In 2014, Canada invested about 87 cents per worker for every dollar invested in the United States; by 2024, that had fallen to 54 cents. Over the same decade, Canadian business investment per worker fell 18.8% while US investment per worker rose 31.3%.<sup>2<\/sup><\/span><\/p>\n<p><span data-contrast=\"auto\">Add the 2014 oil price collapse and the cancellation of Northern Gateway, Energy East and Keystone XL, and a perception took hold that large Canadian infrastructure couldn't get built. That's why Alberta's current data centre and gas-to-power push matters: it's a test of whether that perception is finally changing.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-75108 size-full\" src=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-101423.png\" alt=\"\" width=\"868\" height=\"284\" srcset=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-101423.png 868w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-101423-300x98.png 300w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-101423-150x49.png 150w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-101423-768x251.png 768w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-101423-18x6.png 18w\" sizes=\"auto, (max-width: 868px) 100vw, 868px\" \/><\/p>\n<p><strong>The Bill Comes Due<\/strong><\/p>\n<p><span data-contrast=\"auto\">To put some numbers behind this trend, ASCE's 2025 Report Card graded US energy infrastructure a D+, down from C\u2013 in 2021, and projects a $3.7 trillion gap between planned and needed infrastructure investment, up from $2.59 trillion four years earlier.<sup>3<\/sup><\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-75163 size-full aligncenter\" src=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-18-102817.png\" alt=\"\" width=\"1412\" height=\"184\" srcset=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-18-102817.png 1412w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-18-102817-300x39.png 300w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-18-102817-1024x133.png 1024w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-18-102817-150x20.png 150w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-18-102817-768x100.png 768w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-18-102817-18x2.png 18w\" sizes=\"auto, (max-width: 1412px) 100vw, 1412px\" \/><\/p>\n<p><span data-contrast=\"auto\">Underinvestment flattered returns for 15 years. Low reinvestment boosted free cash flow, buybacks and margins across utilities, energy and industrials, while capital-light sectors captured the valuation premium.\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">But today we are starting to see a reversal. Capital intensity is rising across the economy, scarce physical capacity continues to push upward, and returns are <\/span><span data-contrast=\"auto\">likely<\/span><span data-contrast=\"auto\"> shifting toward whoever owns the bottlenecks. Not to mention, this cycle carries an inflationary element the latter didn't. Rebuilding physical capacity competes for labour, materials and equipment in a way software never did, one reason the capital-light era's mix of low rates and high multiples may not return quickly.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-75164 size-large\" src=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-18-102917-1024x351.png\" alt=\"\" width=\"1024\" height=\"351\" srcset=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-18-102917-1024x351.png 1024w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-18-102917-300x103.png 300w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-18-102917-150x51.png 150w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-18-102917-768x263.png 768w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-18-102917-1536x527.png 1536w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-18-102917-18x6.png 18w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-18-102917.png 1589w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p><span style=\"font-size: 14pt; color: #ab2258;\"><strong>03 - THE DEMAND SHOCK<\/strong><\/span><\/p>\n<p><b><span data-contrast=\"auto\">AI is Becoming a Resource Story<\/span><\/b><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Investors still tend to view AI as a software story. It is rapidly becoming a resource story. What separates this cycle from the digitalization that came before is its collision with physical reality: the binding constraint has shifted from code to power.\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The infrastructure behind AI demands staggering amounts of electricity, copper, steel, cement, natural gas and critical minerals. Data centres are becoming some of the largest power consumers anywhere, forcing utilities to rethink grids built for a very different world. And financing it all means a massive amount of capital required.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">The Hyperscaler Spending Surge<\/span><\/b><\/p>\n<p><span data-contrast=\"auto\">If AI is the demand shock, the hyperscalers are the most obvious starting point. Microsoft, Meta, Amazon and Alphabet (the largest cloud and AI platforms) are anchor customers for this build. Their data centre orders set demand for chips, power, electrical equipment and construction all the way down the supply chain. In <\/span><span data-contrast=\"auto\">addition,<\/span><span data-contrast=\"auto\"> their business models personify the shift we have been describing. For most of the last fifteen years, these companie<\/span><span data-contrast=\"auto\">s have be<\/span><span data-contrast=\"auto\">en the capital-light market winners. Today, they're writing some of the largest capex cheques in corporate history.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-75113 size-full\" src=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-102527.png\" alt=\"\" width=\"823\" height=\"107\" srcset=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-102527.png 823w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-102527-300x39.png 300w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-102527-150x20.png 150w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-102527-768x100.png 768w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-102527-18x2.png 18w\" sizes=\"auto, (max-width: 823px) 100vw, 823px\" \/><\/p>\n<p><span data-contrast=\"auto\">Their combined capex reached $301 billion in the first half of 2026 alone, with updated guidance pointing to $732.5 billion for the full year, 39% above analyst expectations from November 2025 and 158% above expectations from September 2024.<sup>4 <\/sup><\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">As a result of this spending the financial profiles of these companies is changing significantly. Capex now runs at roughly half of revenue for several hyperscalers<\/span><span data-contrast=\"auto\">,<sup>5<\/sup> which<\/span><span data-contrast=\"auto\"> is even higher than the mid-teens to 20s typical of mature telecoms and utilities. In <\/span><span data-contrast=\"auto\">addition,<\/span><span data-contrast=\"auto\"> analyst estimates are calling for FY26 free cash flow <\/span><span data-contrast=\"auto\">could<\/span><span data-contrast=\"auto\"> approach zero or turn negative for all but Alphabet and Microsoft.<sup>6<\/sup> In order to fund this amount of spending, Meta, Alphabet and Amazon have each raised tens of billions in bonds since late 2025 and that isn\u2019t expected to stop. <\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Downstream: Utilities and Power<\/span><\/b><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Importantly, this build doesn't stop at t<\/span><span data-contrast=\"auto\">he data centre. It has downstream effects on utilities, power generators, equipment makers and commodity producers alike. S&amp;P Global expects US investor-owned utility capex near $1.3 trillion over 2026\u20132030, with the electric utility group's spending rising from about $81 billion in 2025 to $108 billion in 2026 and $112 billion b<\/span><span data-contrast=\"auto\">y 2028<\/span><span data-contrast=\"auto\">.<sup>7<\/sup><\/span><span data-contrast=\"auto\"> The appetite for spending is there but now investors are faced with the question as to whether the physical system can absorb that much <\/span><span data-contrast=\"auto\">spending and<\/span><span data-contrast=\"auto\"> build what it's paying for.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p><span style=\"font-size: 14pt; color: #ab2258;\"><b>04 - CONSTRAINTS<\/b><\/span><\/p>\n<p><strong>The Bottlenecks are Physical<\/strong><\/p>\n<p><span data-contrast=\"auto\">Right now, it can't, at least not at the pace being planned. The first constraint is equipment: as noted earlier, large gas turbines are sold out for years, and transformers face similar backlogs. The second is execution. In early 2026, approximately 60% of planned solar projects and 50% of battery storage projects experienced delays<\/span><span data-contrast=\"auto\">.<sup>8<\/sup><\/span><sup><span data-ccp-props=\"{}\">\u00a0<\/span><\/sup><\/p>\n<p><span data-contrast=\"auto\">Then there's the question of who pays. In West Virginia, a FirstEnergy subsidiary plans to spread the cost of $2.7 billion in new generation, built largely for one data centre customer across its broader customer base. But, asking ratepayers to suddenly fund expensive capital build-outs is a hard sell, and we believe affordability, maybe even more than demand, is becoming the binding constraint.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-75127 aligncenter\" src=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-104713.png\" alt=\"\" width=\"411\" height=\"371\" srcset=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-104713.png 734w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-104713-300x271.png 300w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-104713-150x135.png 150w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-104713-13x12.png 13w\" sizes=\"auto, (max-width: 411px) 100vw, 411px\" \/><\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p><span style=\"font-size: 14pt; color: #ab2258;\"><strong>05 - CONVERGING DEMAND<\/strong><\/span><\/p>\n<p><b><span data-contrast=\"auto\">F<\/span><\/b><b><span data-contrast=\"auto\">our forces converging on the same physical system<\/span><\/b><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">If AI were the only source of demand, those constraints would be manageable, and perhaps the system would simply build a little slower. But AI isn't standing alone. Four forces are converging on the same physical system at once, and all four are drawing on the same constrained pool of equipment, labour and power.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ol>\n<li><b><span data-contrast=\"auto\"> AI and data centres<\/span><\/b><\/li>\n<\/ol>\n<p style=\"text-align: left; padding-left: 40px;\"><span data-contrast=\"auto\">Unprecedented compute investment, at unprecedented power density. Single AI racks now draw over 100 kW, versus 5\u201310 kW in a traditional data centre. North American data centre electricity consumption is projected to nearly double, from over 386 TWh in 2025 to about 755 TWh by 2030<\/span><span data-contrast=\"auto\">.<sup>9<\/sup><\/span><sup><span data-ccp-props=\"{}\">\u00a0<\/span><\/sup><\/p>\n<ol start=\"2\">\n<li><b><span data-contrast=\"auto\"> Electrification<\/span><\/b><\/li>\n<\/ol>\n<p style=\"padding-left: 40px;\"><span data-contrast=\"auto\">Growing load from transportation, industry, buildings and digital infrastructure makes the grid the single largest capital requirement in the build. Global transmission and distribution networks may need $15.8 trillion of cumulative investment between 2025 and 2050.<\/span><sup><span data-contrast=\"auto\">10<\/span><\/sup><span data-contrast=\"auto\"> In the US, peak demand is forecast to rise 18% over the next decade.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ol start=\"3\">\n<li><b><span data-contrast=\"auto\"> Reshoring, energy security and reindustrialization<\/span><\/b><\/li>\n<\/ol>\n<p style=\"padding-left: 40px;\"><span data-contrast=\"auto\">The push for resilient domestic supply chains is redrawing the production map. US manufacturing construction spending roughly tripled from $82 billion in 2021 to $244 billion in 2024.<sup>11<\/sup> About $1.42 trillion of new US manufacturing investment was announced between January 2025 and mid-March 2026, concentrated in semiconductors, pharmaceuticals and clean energy.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p style=\"padding-left: 40px;\"><span data-contrast=\"auto\">Every new plant also needs reliable power, which is why generation, fuel supply, pipelines and domestic production are back on the policy agenda. In Canada, it's already showing up in Alberta. Pembina's $4.6 billion, 932 MW Greenlight Electricity Centre <\/span><span data-contrast=\"auto\">is intended to<\/span><span data-contrast=\"auto\"> serve a data centre, turning price-challenged gas into contracted, long-duration power revenue.\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ol start=\"4\">\n<li><b><span data-contrast=\"auto\">Aging infrastructure and deferred investment<\/span><\/b><\/li>\n<\/ol>\n<p style=\"padding-left: 40px;\"><span data-contrast=\"auto\">Replacement and modernization that can no longer be postponed. Much of North America's energy system is nearing the end of its service life, and the investment gap is widening, not closing. Any one of these would support a healthy capex cycle. Together, they compete for the same transformers, electricians, turbines and interconnection queues.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-75131 size-full\" src=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-104845.png\" alt=\"\" width=\"1310\" height=\"661\" srcset=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-104845.png 1310w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-104845-300x151.png 300w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-104845-1024x517.png 1024w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-104845-150x76.png 150w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-104845-768x388.png 768w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-104845-18x9.png 18w\" sizes=\"auto, (max-width: 1310px) 100vw, 1310px\" \/><\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p><span style=\"font-size: 14pt; color: #ab2258;\"><b>06 - CYCLE DYNAMICS<\/b><\/span><\/p>\n<p><strong>More Than a Normal Construction Cycle<\/strong><\/p>\n<p><span data-contrast=\"auto\">A normal construction cycle is rate-sensitive, spread across many small buyers, and mean-reverts within a few years as supply catches up. <\/span><span data-contrast=\"auto\">We believe, t<\/span><span data-contrast=\"auto\">his build is different, it represents a transition of the digital economy toward an industrial model, where physical assets are the competitive moat. Four features set this cycle apart:\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ol>\n<li><b><span data-contrast=\"auto\"> The buyers are rewriting their business models<\/span><\/b><\/li>\n<\/ol>\n<p style=\"padding-left: 40px;\"><span data-contrast=\"auto\">In a typical cycle, developers, homebuilders or industrial firms add capacity at the margin and pull back when conditions change. Here the demand comes from the world's largest companies, and they aren't adding capacity to an existing model. They're changing what kind of company they are. When a handful of megacaps move from asset-light to capex approaching half of revenue, it resets how that part of the market is valued.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ol start=\"2\">\n<li><b><span data-contrast=\"auto\"> It breaks a multi-decade demand trend<\/span><\/b><\/li>\n<\/ol>\n<p style=\"padding-left: 40px;\"><span data-contrast=\"auto\">Construction cycles usually oscillate around a stable trend. Electricity demand growing at 4% a year after 15 flat years isn't an oscillation, it's a new trend line. A shift that size forces utilities to rebuild their long-range planning from scratch, and their capex step-up shows they already are.\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ol start=\"3\">\n<li><b><span data-contrast=\"auto\"> Every layer is being built at once<\/span><\/b><\/li>\n<\/ol>\n<p style=\"padding-left: 40px;\"><span data-contrast=\"auto\">A housing or office boom mostly stresses one supply chain. This build needs chips, data centres, generation, transmission, gas supply, cooling and skilled labour simultaneously, and each layer <\/span><span data-contrast=\"auto\">can<\/span><span data-contrast=\"auto\"> constrains the others. With turbines scarce, developers are turning to on-site gas engines while utilities extend coal plants and pursue batteries and transmission upgrades. When the bottleneck is physical rather than financial, cheaper credit <\/span><span data-contrast=\"auto\">alone may not<\/span><span data-contrast=\"auto\"> speed things up. That keeps pricing power with suppliers for longer than a normal cycle would.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ol start=\"4\">\n<li><b><span data-contrast=\"auto\"> The motive is strategic, not rate-driven<\/span><\/b><\/li>\n<\/ol>\n<p style=\"padding-left: 40px;\"><span data-contrast=\"auto\">Normal cycles turn when rates rise or margins compress. This one is propelled by a competitive race among hyperscalers, plus national-security and industrial-policy goals like reshoring and energy security. Hyperscalers have kept raising guidance even as free cash flow approaches zero and they turn to bond markets. Spending that continues while cash generation deteriorates is the opposite of normal cyclical behaviour, where falling cash flow triggers cuts.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p><span style=\"font-size: 14pt; color: #ab2258;\"><strong>07 - HISTORICAL LENS<\/strong><\/span><\/p>\n<p><b><span data-contrast=\"auto\">Is this another 1999?<\/span><\/b><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">It's the question on many investors' minds, and the answer is more complicated than yes or no. Our short answer: partly.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Where it differs.<\/span><\/b><span data-contrast=\"auto\"> The late-1990s fibre build was funded largely by leveraged, often unprofitable carriers. Today's biggest spenders are among the most profitable companies in history. And much of the physical layer is backed by replacement need that exists with or without AI.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Where it is alike.<\/span><\/b><span data-contrast=\"auto\"> The spenders' cash cushion is thinning. Free cash flow is expected to approach zero or turn negative this year for some of the large hyperscalers, and funding has shifted to bond markets and off-balance-sheet vehicles. Servers with five-to-six-year lives financed with long-dated debt is a duration mismatch the telecom era would recognize. And depreciation hasn't caught up to the spend yet.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The fibre of 1999 got built, lit and eventually used. The equity that funded it mostly didn't earn its return. The lesson isn't to avoid the build, it's to be deliberate about which part of it you own.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p><span style=\"font-size: 14pt; color: #ab2258;\"><b>08 - CONCLUSION<\/b><\/span><\/p>\n<p><b><span data-contrast=\"auto\">Follow the Bottlenecks<\/span><\/b><\/p>\n<p><span data-contrast=\"auto\">When everything needs building at onc<\/span><span data-contrast=\"auto\">e, we believe v<\/span><span data-contrast=\"auto\">alue accrues to whatever is scarce. Today that's heavy electrical equipment, skilled labour and specialty contractors, permitted and powered land, grid interconnection and firm power.\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The capital-light era rewarded owning nothing. The next one may reward owning the thing everyone else is waiting for.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-75133 size-full\" src=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-105206.png\" alt=\"\" width=\"1272\" height=\"690\" srcset=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-105206.png 1272w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-105206-300x163.png 300w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-105206-1024x555.png 1024w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-105206-150x81.png 150w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-105206-768x417.png 768w, https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-17-105206-18x10.png 18w\" sizes=\"auto, (max-width: 1272px) 100vw, 1272px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #ab2258;\"><strong>To find out who your <span style=\"color: #ab2258;\">local<\/span> Pender contact is, please visit <span style=\"color: #ab2258;\"><a style=\"color: #ab2258;\" href=\"https:\/\/penderfund.com\/contact-us\/\">https:\/\/penderfund.com\/contact-us\/<\/a><\/span><\/strong><\/span><\/p>\n<p><span data-contrast=\"auto\">This white paper contains certain forward-looking statements within the meaning of applicable securities laws. Forward-looking statements are frequently characterized by words such as \"expect\", \"believe\", \"anticipate\", \"may\", \"could\", \"would\", \"should\", \"will\", \"estimate\", \"project\" and similar expressions. These statements are based on current opinions, expectations and assumptions as of the date they are made and are subject to a variety of risks, uncertainties and other factors that could cause actual events, results or outcomes to differ materially from those expressed or implied in the forward-looking statements. Readers should not place undue reliance on forward-looking statements. The views expressed are subject to change without notice and no obligation is undertaken to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span style=\"color: #ab2258;\"><strong>References<\/strong><\/span><\/p>\n<p class=\"___1et8vw6 f18zxyen f1mevb6\">[1] Vistergy, \"Gas Turbines Are Sold Out to 2030,\" Vistergy, accessed November 18, 2026, <span class=\"___13jcyjl f1d3bq9a fz5stix\" data-trailing-punctuation-glue=\"\"><span class=\"fui-Link fai-bebop ___17338g5 f2hkw1w f3rmtva f1ewtqcl f16muhyy f1k6fduh f1w7gpdv f1mo0ibp fjoy568 ff5ikls f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f33ey8m f9n3di6 f1ids18y f1tx3yz7 f1bwia3u f1eh06m1 f1xeumsx fhgqx19 f1olyrje f1p93eir f1nev41a f1u3tvpl fbabzkn f1gqcn34 f5w875z fc43amm f1qumt79 f6juhto f1tsf1ni fnq52rx f16zlvvm\" tabindex=\"0\" role=\"button\" data-tabster=\"{&quot;restorer&quot;:{&quot;type&quot;:1}}\" aria-haspopup=\"dialog\" data-telemetry-id=\"ContextEntityLink.GatedExternalLink\">https:\/\/vistergy.com\/p\/gas-turbines-are-sold-out-to-2030<\/span>.<\/span><\/p>\n<p class=\"___1et8vw6 f18zxyen f1mevb6\">[2] Tegan Hill, Joel Emes, and Taylor Oliver, <em class=\"___11wyd0v f1j4dglz\">Comparing Business Investment per Worker in Canada and the United States, 2007\u20132024<\/em> (Fraser Institute, July 16, 2026), <span class=\"___13jcyjl f1d3bq9a fz5stix\" data-trailing-punctuation-glue=\"\"><span class=\"fui-Link fai-bebop ___17338g5 f2hkw1w f3rmtva f1ewtqcl f16muhyy f1k6fduh f1w7gpdv f1mo0ibp fjoy568 ff5ikls f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f33ey8m f9n3di6 f1ids18y f1tx3yz7 f1bwia3u f1eh06m1 f1xeumsx fhgqx19 f1olyrje f1p93eir f1nev41a f1u3tvpl fbabzkn f1gqcn34 f5w875z fc43amm f1qumt79 f6juhto f1tsf1ni fnq52rx f16zlvvm\" tabindex=\"0\" role=\"button\" data-tabster=\"{&quot;restorer&quot;:{&quot;type&quot;:1}}\" aria-haspopup=\"dialog\" data-telemetry-id=\"ContextEntityLink.GatedExternalLink\">https:\/\/www.fraserinstitute.org\/studies\/comparing-business-investment-per-worker-canada-and-united-states-2007-2024<\/span>.<\/span><\/p>\n<p class=\"___1et8vw6 f18zxyen f1mevb6\">[3] \"ASCE-EWRI Government Relations Update,\" American Society of Civil Engineers, May 1, 2025, <span class=\"___13jcyjl f1d3bq9a fz5stix\" data-trailing-punctuation-glue=\"\"><span class=\"fui-Link fai-bebop ___17338g5 f2hkw1w f3rmtva f1ewtqcl f16muhyy f1k6fduh f1w7gpdv f1mo0ibp fjoy568 ff5ikls f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f33ey8m f9n3di6 f1ids18y f1tx3yz7 f1bwia3u f1eh06m1 f1xeumsx fhgqx19 f1olyrje f1p93eir f1nev41a f1u3tvpl fbabzkn f1gqcn34 f5w875z fc43amm f1qumt79 f6juhto f1tsf1ni fnq52rx f16zlvvm\" tabindex=\"0\" role=\"button\" data-tabster=\"{&quot;restorer&quot;:{&quot;type&quot;:1}}\" aria-haspopup=\"dialog\" data-telemetry-id=\"ContextEntityLink.GatedExternalLink\">https:\/\/www.asce.org\/communities\/institutes-and-technical-groups\/environmental-and-water-resources-institute\/news\/asce-ewri-government-relations-update<\/span>.<\/span><\/p>\n<p class=\"___1et8vw6 f18zxyen f1mevb6\">[4] Beth Kindig, \"AI Capex to Hit $1 Trillion\u2014and Estimates Are Still Too Low,\" I\/O Fund, August 5, 2026, <span class=\"___13jcyjl f1d3bq9a fz5stix\" data-trailing-punctuation-glue=\"\"><span class=\"fui-Link fai-bebop ___17338g5 f2hkw1w f3rmtva f1ewtqcl f16muhyy f1k6fduh f1w7gpdv f1mo0ibp fjoy568 ff5ikls f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f33ey8m f9n3di6 f1ids18y f1tx3yz7 f1bwia3u f1eh06m1 f1xeumsx fhgqx19 f1olyrje f1p93eir f1nev41a f1u3tvpl fbabzkn f1gqcn34 f5w875z fc43amm f1qumt79 f6juhto f1tsf1ni fnq52rx f16zlvvm\" tabindex=\"0\" role=\"button\" data-tabster=\"{&quot;restorer&quot;:{&quot;type&quot;:1}}\" aria-haspopup=\"dialog\" data-telemetry-id=\"ContextEntityLink.GatedExternalLink\">https:\/\/io-fund.com\/ai-stocks\/ai-capex-1-trillion-estimates-too-low<\/span>.<\/span><\/p>\n<p class=\"___1et8vw6 f18zxyen f1mevb6\">[5] Jordan Chalfin and Michael Pugh, \"Tech: Raising Hyperscaler Capex 2026 Estimates,\" CreditSights, February 9, 2026, <span class=\"___13jcyjl f1d3bq9a fz5stix\" data-trailing-punctuation-glue=\"\"><span class=\"fui-Link fai-bebop ___17338g5 f2hkw1w f3rmtva f1ewtqcl f16muhyy f1k6fduh f1w7gpdv f1mo0ibp fjoy568 ff5ikls f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f33ey8m f9n3di6 f1ids18y f1tx3yz7 f1bwia3u f1eh06m1 f1xeumsx fhgqx19 f1olyrje f1p93eir f1nev41a f1u3tvpl fbabzkn f1gqcn34 f5w875z fc43amm f1qumt79 f6juhto f1tsf1ni fnq52rx f16zlvvm\" tabindex=\"0\" role=\"button\" data-tabster=\"{&quot;restorer&quot;:{&quot;type&quot;:1}}\" aria-haspopup=\"dialog\" data-telemetry-id=\"ContextEntityLink.GatedExternalLink\">https:\/\/www.fitchsolutions.com\/creditsights\/articles\/technology\/tech-raising-hyperscaler-capex-2026-estimates-09-02-2026<\/span>.<\/span><\/p>\n<p class=\"___1et8vw6 f18zxyen f1mevb6\">[6] \"Hyperscalers Tap External Financing as AI Capex Outruns Cash Flow,\" FactSet Insight, July 23, 2026, <span class=\"___13jcyjl f1d3bq9a fz5stix\" data-trailing-punctuation-glue=\"\"><span class=\"fui-Link fai-bebop ___17338g5 f2hkw1w f3rmtva f1ewtqcl f16muhyy f1k6fduh f1w7gpdv f1mo0ibp fjoy568 ff5ikls f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f33ey8m f9n3di6 f1ids18y f1tx3yz7 f1bwia3u f1eh06m1 f1xeumsx fhgqx19 f1olyrje f1p93eir f1nev41a f1u3tvpl fbabzkn f1gqcn34 f5w875z fc43amm f1qumt79 f6juhto f1tsf1ni fnq52rx f16zlvvm\" tabindex=\"0\" role=\"button\" data-tabster=\"{&quot;restorer&quot;:{&quot;type&quot;:1}}\" aria-haspopup=\"dialog\" data-telemetry-id=\"ContextEntityLink.GatedExternalLink\">https:\/\/insight.factset.com\/hyperscalers-tap-external-financing-as-ai-capex-outruns-cash-flow<\/span>.<\/span><\/p>\n<p class=\"___1et8vw6 f18zxyen f1mevb6\">[7] Jason Lehmann, Dan Lowrey, and Heike Doerr, \"Surging Energy Demand Puts US Utility Capex Forecast near $1.3T in 2026\u201330,\" S&amp;P Global Market Intelligence, April 23, 2026, <span class=\"___13jcyjl f1d3bq9a fz5stix\" data-trailing-punctuation-glue=\"\"><span class=\"fui-Link fai-bebop ___17338g5 f2hkw1w f3rmtva f1ewtqcl f16muhyy f1k6fduh f1w7gpdv f1mo0ibp fjoy568 ff5ikls f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f33ey8m f9n3di6 f1ids18y f1tx3yz7 f1bwia3u f1eh06m1 f1xeumsx fhgqx19 f1olyrje f1p93eir f1nev41a f1u3tvpl fbabzkn f1gqcn34 f5w875z fc43amm f1qumt79 f6juhto f1tsf1ni fnq52rx f16zlvvm\" tabindex=\"0\" role=\"button\" data-tabster=\"{&quot;restorer&quot;:{&quot;type&quot;:1}}\" aria-haspopup=\"dialog\" data-telemetry-id=\"ContextEntityLink.GatedExternalLink\">https:\/\/www.spglobal.com\/market-intelligence\/en\/news-insights\/research\/2026\/04\/surging-energy-demand-puts-us-utility-capex-forecast-near-1-3t-in-2026-30<\/span>.<\/span><\/p>\n<p class=\"___1et8vw6 f18zxyen f1mevb6\">[8] Piercen Hoekstra, \"Record Utility Spending Meets Project Reality,\" ADI Analytics, July 2, 2026, <span class=\"___13jcyjl f1d3bq9a fz5stix\" data-trailing-punctuation-glue=\"\"><span class=\"fui-Link fai-bebop ___17338g5 f2hkw1w f3rmtva f1ewtqcl f16muhyy f1k6fduh f1w7gpdv f1mo0ibp fjoy568 ff5ikls f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f33ey8m f9n3di6 f1ids18y f1tx3yz7 f1bwia3u f1eh06m1 f1xeumsx fhgqx19 f1olyrje f1p93eir f1nev41a f1u3tvpl fbabzkn f1gqcn34 f5w875z fc43amm f1qumt79 f6juhto f1tsf1ni fnq52rx f16zlvvm\" tabindex=\"0\" role=\"button\" data-tabster=\"{&quot;restorer&quot;:{&quot;type&quot;:1}}\" aria-haspopup=\"dialog\" data-telemetry-id=\"ContextEntityLink.GatedExternalLink\">https:\/\/adi-analytics.com\/2026\/07\/02\/record-utility-spending-meets-project-reality\/<\/span>.<\/span><\/p>\n<p class=\"___1et8vw6 f18zxyen f1mevb6\">[9] David Stanway, \"AI to Double Data Centre Power and Water Consumption by 2030, UN Researchers Say,\" Reuters, June 3, 2026, <span class=\"___13jcyjl f1d3bq9a fz5stix\" data-trailing-punctuation-glue=\"\"><span class=\"fui-Link fai-bebop ___17338g5 f2hkw1w f3rmtva f1ewtqcl f16muhyy f1k6fduh f1w7gpdv f1mo0ibp fjoy568 ff5ikls f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f33ey8m f9n3di6 f1ids18y f1tx3yz7 f1bwia3u f1eh06m1 f1xeumsx fhgqx19 f1olyrje f1p93eir f1nev41a f1u3tvpl fbabzkn f1gqcn34 f5w875z fc43amm f1qumt79 f6juhto f1tsf1ni fnq52rx f16zlvvm\" tabindex=\"0\" role=\"button\" data-tabster=\"{&quot;restorer&quot;:{&quot;type&quot;:1}}\" aria-haspopup=\"dialog\" data-telemetry-id=\"ContextEntityLink.GatedExternalLink\">https:\/\/www.reuters.com\/business\/energy\/ai-double-data-centre-power-water-consumption-by-2030-un-researchers-say-2026-06-03\/<\/span>.<\/span><\/p>\n<p class=\"___1et8vw6 f18zxyen f1mevb6\">[10] Felicia Aminoff, \"Electric Vehicles Remain Key Driver for Grid Investment Despite Data Center Boom,\" BloombergNEF, September 2, 2025, <span class=\"___13jcyjl f1d3bq9a fz5stix\" data-trailing-punctuation-glue=\"\"><span class=\"fui-Link fai-bebop ___17338g5 f2hkw1w f3rmtva f1ewtqcl f16muhyy f1k6fduh f1w7gpdv f1mo0ibp fjoy568 ff5ikls f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f33ey8m f9n3di6 f1ids18y f1tx3yz7 f1bwia3u f1eh06m1 f1xeumsx fhgqx19 f1olyrje f1p93eir f1nev41a f1u3tvpl fbabzkn f1gqcn34 f5w875z fc43amm f1qumt79 f6juhto f1tsf1ni fnq52rx f16zlvvm\" tabindex=\"0\" role=\"button\" data-tabster=\"{&quot;restorer&quot;:{&quot;type&quot;:1}}\" aria-haspopup=\"dialog\" data-telemetry-id=\"ContextEntityLink.GatedExternalLink\">https:\/\/about.bnef.com\/insights\/clean-energy\/electric-vehicles-remain-key-driver-for-grid-investment-despite-data-center-boom\/<\/span>.<\/span><\/p>\n<p class=\"___1et8vw6 f18zxyen f1mevb6\">[11] U.S. Census Bureau, \"Total Construction Spending: Manufacturing in the United States [TLMFGCONS],\" retrieved from FRED, Federal Reserve Bank of St. Louis, accessed November 18, 2026, <span class=\"___13jcyjl f1d3bq9a fz5stix\" data-trailing-punctuation-glue=\"\"><span class=\"fui-Link fai-bebop ___17338g5 f2hkw1w f3rmtva f1ewtqcl f16muhyy f1k6fduh f1w7gpdv f1mo0ibp fjoy568 ff5ikls f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f33ey8m f9n3di6 f1ids18y f1tx3yz7 f1bwia3u f1eh06m1 f1xeumsx fhgqx19 f1olyrje f1p93eir f1nev41a f1u3tvpl fbabzkn f1gqcn34 f5w875z fc43amm f1qumt79 f6juhto f1tsf1ni fnq52rx f16zlvvm\" tabindex=\"0\" role=\"button\" data-tabster=\"{&quot;restorer&quot;:{&quot;type&quot;:1}}\" aria-haspopup=\"dialog\" data-telemetry-id=\"ContextEntityLink.GatedExternalLink\">https:\/\/fred.stlouisfed.org\/series\/TLMFGCONS<\/span>.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; 01 - INTRODUCTION The End of Capital-Light For fifteen years, investors paid a premium for capital-light business models, businesses that scaled on code and near-zero marginal cost. Anyone who poured concrete, strung wire or pulled resources out of the ground got a very different message: cut capex and hand the cash back to shareholders.\u00a0 [&hellip;]<\/p>\n","protected":false},"author":13,"featured_media":75169,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[106],"tags":[],"fund-type":[],"class_list":["post-75104","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.4 (Yoast SEO v28.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>The Great Infrastructure Build-Out: Investing in the Return of the Physical Economy - PenderFund Capital Management<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/penderfund.com\/fr\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/\" \/>\n<meta property=\"og:locale\" content=\"fr_CA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Great Infrastructure Build-Out: Investing in the Return of the Physical Economy\" \/>\n<meta property=\"og:description\" content=\"&nbsp; 01 - INTRODUCTION The End of Capital-Light For fifteen years, investors paid a premium for capital-light business models, businesses that scaled on code and near-zero marginal cost. Anyone who poured concrete, strung wire or pulled resources out of the ground got a very different message: cut capex and hand the cash back to shareholders.\u00a0 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/penderfund.com\/fr\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/\" \/>\n<meta property=\"og:site_name\" content=\"PenderFund Capital Management\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/penderfund\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-18T18:00:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-18T18:37:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Thumbnail-The-Great-Infrastructure-Build-Out.png\" \/>\n\t<meta property=\"og:image:width\" content=\"850\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Samantha McLean\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Samantha McLean\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimation du temps de lecture\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/penderfund.com\\\/articles\\\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/penderfund.com\\\/articles\\\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\\\/\"},\"author\":{\"name\":\"Samantha McLean\",\"@id\":\"https:\\\/\\\/penderfund.com\\\/#\\\/schema\\\/person\\\/ad6e2175623541bc1c9dd9f475bd33cf\"},\"headline\":\"The Great Infrastructure Build-Out: Investing in the Return of the Physical Economy\",\"datePublished\":\"2026-11-18T18:00:14+00:00\",\"dateModified\":\"2026-11-18T18:37:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/penderfund.com\\\/articles\\\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\\\/\"},\"wordCount\":2756,\"publisher\":{\"@id\":\"https:\\\/\\\/penderfund.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/penderfund.com\\\/articles\\\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/penderfund.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Thumbnail-The-Great-Infrastructure-Build-Out.png\",\"articleSection\":[\"Articles\"],\"inLanguage\":\"fr-CA\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/penderfund.com\\\/articles\\\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\\\/\",\"url\":\"https:\\\/\\\/penderfund.com\\\/articles\\\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\\\/\",\"name\":\"The Great Infrastructure Build-Out: Investing in the Return of the Physical Economy - PenderFund Capital Management\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/penderfund.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/penderfund.com\\\/articles\\\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/penderfund.com\\\/articles\\\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/penderfund.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Thumbnail-The-Great-Infrastructure-Build-Out.png\",\"datePublished\":\"2026-11-18T18:00:14+00:00\",\"dateModified\":\"2026-11-18T18:37:49+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/penderfund.com\\\/articles\\\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\\\/#breadcrumb\"},\"inLanguage\":\"fr-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/penderfund.com\\\/articles\\\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\\\/\\\/penderfund.com\\\/articles\\\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\\\/#primaryimage\",\"url\":\"https:\\\/\\\/penderfund.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Thumbnail-The-Great-Infrastructure-Build-Out.png\",\"contentUrl\":\"https:\\\/\\\/penderfund.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Thumbnail-The-Great-Infrastructure-Build-Out.png\",\"width\":850,\"height\":400},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/penderfund.com\\\/articles\\\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/penderfund.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Great Infrastructure Build-Out: Investing in the Return of the Physical Economy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/penderfund.com\\\/#website\",\"url\":\"https:\\\/\\\/penderfund.com\\\/\",\"name\":\"PenderFund Capital Management\",\"description\":\"Forward thinking. Finding value.\",\"publisher\":{\"@id\":\"https:\\\/\\\/penderfund.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/penderfund.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-CA\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/penderfund.com\\\/#organization\",\"name\":\"PenderFund Capital Management\",\"url\":\"https:\\\/\\\/penderfund.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\\\/\\\/penderfund.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/penderfund.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/PenderFund-Cap-Man-Logo_English.png\",\"contentUrl\":\"https:\\\/\\\/penderfund.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/PenderFund-Cap-Man-Logo_English.png\",\"width\":850,\"height\":250,\"caption\":\"PenderFund Capital Management\"},\"image\":{\"@id\":\"https:\\\/\\\/penderfund.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/penderfund\\\/\",\"https:\\\/\\\/www.instagram.com\\\/penderfund\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/penderfund-capital-management\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/penderfund.com\\\/#\\\/schema\\\/person\\\/ad6e2175623541bc1c9dd9f475bd33cf\",\"name\":\"Samantha McLean\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/cc50fa7128db05be007e501badbbaed0cb75da7bbe5da9beff6fdec4b89b91ad?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/cc50fa7128db05be007e501badbbaed0cb75da7bbe5da9beff6fdec4b89b91ad?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/cc50fa7128db05be007e501badbbaed0cb75da7bbe5da9beff6fdec4b89b91ad?s=96&d=mm&r=g\",\"caption\":\"Samantha McLean\"},\"url\":\"https:\\\/\\\/penderfund.com\\\/fr\\\/author\\\/smclean\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"The Great Infrastructure Build-Out: Investing in the Return of the Physical Economy - PenderFund Capital Management","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/penderfund.com\/fr\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/","og_locale":"fr_CA","og_type":"article","og_title":"The Great Infrastructure Build-Out: Investing in the Return of the Physical Economy","og_description":"&nbsp; 01 - INTRODUCTION The End of Capital-Light For fifteen years, investors paid a premium for capital-light business models, businesses that scaled on code and near-zero marginal cost. Anyone who poured concrete, strung wire or pulled resources out of the ground got a very different message: cut capex and hand the cash back to shareholders.\u00a0 [&hellip;]","og_url":"https:\/\/penderfund.com\/fr\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/","og_site_name":"PenderFund Capital Management","article_publisher":"https:\/\/www.facebook.com\/penderfund\/","article_published_time":"2026-11-18T18:00:14+00:00","article_modified_time":"2026-11-18T18:37:49+00:00","og_image":[{"width":850,"height":400,"url":"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Thumbnail-The-Great-Infrastructure-Build-Out.png","type":"image\/png"}],"author":"Samantha McLean","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Samantha McLean","Estimation du temps de lecture":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/penderfund.com\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/#article","isPartOf":{"@id":"https:\/\/penderfund.com\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/"},"author":{"name":"Samantha McLean","@id":"https:\/\/penderfund.com\/#\/schema\/person\/ad6e2175623541bc1c9dd9f475bd33cf"},"headline":"The Great Infrastructure Build-Out: Investing in the Return of the Physical Economy","datePublished":"2026-11-18T18:00:14+00:00","dateModified":"2026-11-18T18:37:49+00:00","mainEntityOfPage":{"@id":"https:\/\/penderfund.com\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/"},"wordCount":2756,"publisher":{"@id":"https:\/\/penderfund.com\/#organization"},"image":{"@id":"https:\/\/penderfund.com\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/#primaryimage"},"thumbnailUrl":"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Thumbnail-The-Great-Infrastructure-Build-Out.png","articleSection":["Articles"],"inLanguage":"fr-CA"},{"@type":"WebPage","@id":"https:\/\/penderfund.com\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/","url":"https:\/\/penderfund.com\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/","name":"The Great Infrastructure Build-Out: Investing in the Return of the Physical Economy - PenderFund Capital Management","isPartOf":{"@id":"https:\/\/penderfund.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/penderfund.com\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/#primaryimage"},"image":{"@id":"https:\/\/penderfund.com\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/#primaryimage"},"thumbnailUrl":"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Thumbnail-The-Great-Infrastructure-Build-Out.png","datePublished":"2026-11-18T18:00:14+00:00","dateModified":"2026-11-18T18:37:49+00:00","breadcrumb":{"@id":"https:\/\/penderfund.com\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/#breadcrumb"},"inLanguage":"fr-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/penderfund.com\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/"]}]},{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/penderfund.com\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/#primaryimage","url":"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Thumbnail-The-Great-Infrastructure-Build-Out.png","contentUrl":"https:\/\/penderfund.com\/wp-content\/uploads\/2026\/11\/Thumbnail-The-Great-Infrastructure-Build-Out.png","width":850,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/penderfund.com\/articles\/the-great-infrastructure-build-out-investing-in-the-return-of-the-physical-economy\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/penderfund.com\/"},{"@type":"ListItem","position":2,"name":"The Great Infrastructure Build-Out: Investing in the Return of the Physical Economy"}]},{"@type":"WebSite","@id":"https:\/\/penderfund.com\/#website","url":"https:\/\/penderfund.com\/","name":"Gestion de capital PenderFund lt\u00e9e","description":"Forward thinking. Finding value.","publisher":{"@id":"https:\/\/penderfund.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/penderfund.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-CA"},{"@type":"Organization","@id":"https:\/\/penderfund.com\/#organization","name":"Gestion de capital PenderFund lt\u00e9e","url":"https:\/\/penderfund.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/penderfund.com\/#\/schema\/logo\/image\/","url":"https:\/\/penderfund.com\/wp-content\/uploads\/2025\/06\/PenderFund-Cap-Man-Logo_English.png","contentUrl":"https:\/\/penderfund.com\/wp-content\/uploads\/2025\/06\/PenderFund-Cap-Man-Logo_English.png","width":850,"height":250,"caption":"PenderFund Capital Management"},"image":{"@id":"https:\/\/penderfund.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/penderfund\/","https:\/\/www.instagram.com\/penderfund\/","https:\/\/www.linkedin.com\/company\/penderfund-capital-management\/"]},{"@type":"Person","@id":"https:\/\/penderfund.com\/#\/schema\/person\/ad6e2175623541bc1c9dd9f475bd33cf","name":"Samantha McLean","image":{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/secure.gravatar.com\/avatar\/cc50fa7128db05be007e501badbbaed0cb75da7bbe5da9beff6fdec4b89b91ad?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/cc50fa7128db05be007e501badbbaed0cb75da7bbe5da9beff6fdec4b89b91ad?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/cc50fa7128db05be007e501badbbaed0cb75da7bbe5da9beff6fdec4b89b91ad?s=96&d=mm&r=g","caption":"Samantha McLean"},"url":"https:\/\/penderfund.com\/fr\/author\/smclean\/"}]}},"_links":{"self":[{"href":"https:\/\/penderfund.com\/fr\/wp-json\/wp\/v2\/posts\/75104","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/penderfund.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/penderfund.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/penderfund.com\/fr\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/penderfund.com\/fr\/wp-json\/wp\/v2\/comments?post=75104"}],"version-history":[{"count":38,"href":"https:\/\/penderfund.com\/fr\/wp-json\/wp\/v2\/posts\/75104\/revisions"}],"predecessor-version":[{"id":75174,"href":"https:\/\/penderfund.com\/fr\/wp-json\/wp\/v2\/posts\/75104\/revisions\/75174"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/penderfund.com\/fr\/wp-json\/wp\/v2\/media\/75169"}],"wp:attachment":[{"href":"https:\/\/penderfund.com\/fr\/wp-json\/wp\/v2\/media?parent=75104"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/penderfund.com\/fr\/wp-json\/wp\/v2\/categories?post=75104"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/penderfund.com\/fr\/wp-json\/wp\/v2\/tags?post=75104"},{"taxonomy":"fund-type","embeddable":true,"href":"https:\/\/penderfund.com\/fr\/wp-json\/wp\/v2\/fund-type?post=75104"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}